Lanta delivered a comprehensive full refurbishment, exterior extension, and complete rebrand of the Woolworths Cambridge supermarket – one of the most logistically demanding project types in commercial construction. The works encompassed both a major exterior expansion and a complete interior overhaul, all carried our within a live trading environment with the store remaining operational throughout. Externally, Lanta constructed a new …
22 POLLEN STREET
A former printing facility transformed into a modern commercial building. Lanta reconfigured the original 2.5-level structure, adding three floors and two balconies – increasing leasable area by 50% and car parking by 30%.
ANIMATES
Occupying a prominent corner at one of New Zealand’s busiest intersections, this project involved the full transformation of an existing warehouse on Clark Street into a bold new retail environment for Animates. Lanta delivered a comprehensive building upgrade, retaining only the original roof structure while modernizing the remainder of the facility. The works included significant structural, fire compliance, and civil …
MIELE EXPERIENCE CENTRE
Positioned prominently at the base of College Hill, the Miele Experience Centre has become a distinctive retail landmark within Auckland’s CBD. Designed and delivered by Lanta, the development replaced an existing single-storey building with a contemporary showroom and head office for Miele New Zealand. Expansive full-height glazing maximises views across Victoria Park while creating a striking platform for the display …
AUCKLAND KINDERGARTEN ASSOCIATION
Delivered across three Auckland Kindergarten Association sites in Morningside, Whenuapai and Meadowbank, these projects reflect a long-standing partnership spanning more than 15 years and over 75 completed projects with AKA. Each centre was designed to create warm, engaging early learning centres tailored to their surrounding communities, balancing simplicity, efficiency, and functionality with thoughtful spatial planning. A strong emphasis was placed …
LOLLIPOPS EDUCARE
Delivered as one of three centres completed for Lollipops Educare, this project involved the creation of a purpose-built early learning facility within the upper level of a new commercial development. Positioned on the top floor, the centre was designed to provide a modern, open-plan environment with strong visual connectivity and intuitive flow between spaces. A key feature is the inclusion …
MARIST COLLEGE
This project delivered a modern upgrade to Marist College’s administration facilities, alongside the adaptive reuse of an existing warehouse into a dedicated student wellness centre. The new facility provides purpose-built spaces for nursing, physiotherapy, counseling, and career’s support, creating a welcoming and accessible environment that enhances student wellbeing. Works were carefully staged and coordinated throughout the school term, allowing daily …
MYERS PARK KINDERGARTEN
Upgrading Myers Park Kindergarten required a carefully staged approach within a live education environment, maintaining daily operations while delivering critical structural improvements. The heritage building was brought up to current seismic and fire compliance standards through a programme of intrusive works undertaken outside operating hours. Night works enabled the installation of steel portals, brackets, and structural ties, ensuring the facility …
LIDO CINEMA
The redevelopment of the Lido Cinema involved the expansion and upgrade of the existing theatre complex, transforming the original two-cinema venue into a modern three-cinema facility. Works included the construction of a new upper-level lobby, seismic strengthening, fire and mechanical services upgrades, internal cinema refurbishments, and a complete new roof. Delivered within a constrained site with limited access and parking, …
ST. PETER’S ANGLICAN CHURCH
A carefully managed restoration has revitalised St. Peter’s Anglican Church, preserving its historic character while upgrading performance for future use. After nearly 70 years, the original roof was replaced, with the entire building enclosed in a protective scaffold system to safeguard its heritage fabric throughout construction. Working alongside specialist conservation architects, the project involved meticulous restoration of steel and timber …